1. Design Preparation: First, the design scheme for the water curtain wall needs to be determined, including the shape, dimensions, materials, and color of the wall. Simultaneously, detailed construction drawings need to be prepared, including the structural design of the water curtain wall, the water spray system design, and the electrical system design.
2. Material Preparation: Based on the design scheme and construction drawings, procure the necessary water curtain wall materials, such as glass, steel, aluminum, water pumps, and water pipes.
3. Construction Site Preparation: Clean the construction site, ensuring it is flat and clean. Appropriate safety facilities need to be set up on site, such as safety nets and warning signs.